Second Phase of Intervention Works

SECOND PHASE OF INTERVENTION WORKS

  1. Ewu Flood and Gully Site – Contract Awarded
  1. Ibore Floor and Gully Site – Contract Awarded

The designs of the following 8 sites have also been approved. They are at different levels of award:

  1. Gabonia / Upper Adesuwa Flood Catchment  Alleviation Site
  2. Urora Flood Catchment Alleviation Site
  3. Ogiso /Osunde Flood and Gully Site
  4. Edo College, Benin City Flood and Gully Site
  5. Ambrose Ali University, Ekpoma Flood and Gully Site
  6. Emu Flood and Gully Site.
  7.  Igbe Flood Catchment Alleviation Site.